Industrial Power Factor Correction in Saudi Arabia
Saudi Power Factor Company provides industrial power factor correction in Saudi Arabia for plants, utilities and large buildings that pay reactive energy charges or run short of transformer capacity. Every sector loads its network differently, so each page below explains the typical loads, the right type of correction and what to send us for a quotation.
What you receive: a written proposal with the capacitor rating, step layout, standard, lead time and price within one working day of your electricity bill or load list. Request a quotation

Industrial power factor correction in Saudi Arabia by sector
- Oil and gas facilities: pump, compressor and substation loads, with the documentation vendor-listed projects ask for.
- Petrochemical and plastics plants: extruders, moulding lines and drives in Jubail and Yanbu, usually with detuned banks.
- Cement plants: crushers, fans and conveyors on LV, and mill and kiln motors that may need MV compensation.
- Steel and metal plants: furnaces, rolling mills, welders and cranes, where fast thyristor switching follows the load.
- Water pumping stations: pump motors in outdoor kiosks and pump halls, with enclosures rated for heat and dust.
- Cold storage and food plants: refrigeration compressors and blast freezers that run around the clock.
- Hospitals and healthcare: chillers, lifts and medical loads on networks with UPS units and harmonics.
- Commercial buildings and malls: compact APFC panels for chillers, lifts and lighting in towers and malls.
How the right correction differs by industry
The same kVAr can be delivered in very different ways. Steady motor loads suit fixed capacitor banks or standard APFC panels. Plants with variable speed drives, UPS units or LED lighting need detuned capacitor banks so the capacitors do not resonate with harmonics. Fast, repeated loads such as welders, presses and cranes need thyristor switched capacitor banks. Large motors on 11 kV or 13.8 kV networks may be better served by MV reactive power compensation.
If you are not sure which one applies, a seven-day power quality survey measures your power factor, harmonics and load profile before anything is designed.
How an industrial project runs
- Send your data. A single monthly electricity bill or your motor load list lets us begin the sizing.
- Receive the proposal. Rating, steps, standard, lead time and price within one working day.
- Approve the drawings. We issue the general arrangement and single-line diagram for your review.
- Build and test. The panel is built and tested in our Dammam workshop before dispatch.
- Install and commission. We set the controller to your target power factor and hand over the test record.
Industrial power factor correction questions
Who provides industrial power factor correction in Saudi Arabia?
Saudi Power Factor Company designs, builds and commissions APFC panels, capacitor banks and harmonic filter panels for industrial and commercial sites across Saudi Arabia from its Dammam base.
What affects the cost of industrial power factor correction?
The main factors are the kVAr required, the number of steps, whether reactors or thyristor switching are needed, the enclosure rating, the voltage level and site installation. The quotation sets out the price for your scope.
How long does an industrial installation take?
It depends on the panel type, the rating and site access. Standard APFC panels are quicker to build than detuned, thyristor or MV schemes; the proposal states the lead time for your design.
Do you work with plants outside the Eastern Province?
Yes. We build in Dammam and deliver to every region of Saudi Arabia, including Riyadh, Jeddah and Yanbu.
What should I send for a quotation?
A month of your electricity bill or a load list, the transformer rating, and a single-line diagram if you have one.
Need industrial power factor correction in Saudi Arabia? Send your bill or load list and receive a quotation within one working day.
Email: inquiry@saudipowerfactor.com | Request a quotation
