Power Factor Correction in Al Khobar
Saudi Power Factor Company provides power factor correction in Al Khobar for hotels, hospitals, malls, office towers and light-industrial workshops. Al Khobar is the neighbouring city to our Dammam workshops, so a survey visit, a panel delivery and a service call are all short journeys. Send a bill and we return a sized proposal within one working day.
What you receive: a written Al Khobar proposal showing the kVAr, the panel layout and footprint, delivery and price within one working day of getting your bill. Request a quotation

What is the current power factor of a building?
It is the ratio of the real power your loads use to the total power the supply delivers, and it moves through the day. A mall at midday with chillers running behaves very differently from the same mall at night. Your bill shows the monthly figure; a logger shows the hour-by-hour curve, which is what an automatic panel has to follow. Our power factor penalty page explains how a low figure turns into a charge.
How much capacitor is required for power factor improvement?
Multiply the average kW demand by the difference between the tangent of the present angle and the tangent of the target angle. For a 400 kW load moving from 0.80 to 0.95, that is about 400 x (0.75 - 0.33) = 168 kVAr. This is a worked example, not your figure. We run the same sum against your peak demand, then split it into steps.
Power factor correction in Al Khobar: building types and equipment
Commercial buildings rarely need the largest panels. They need the right control and a footprint that fits an existing electrical room.
| Building type | Loads that matter | Proposal | Typical lead time |
|---|---|---|---|
| Hotels and towers | Chillers, lifts, pumps | Automatic panel, 12-step controller | 2–3 weeks |
| Hospitals and clinics | Chillers, imaging, UPS | Detuned panel, see healthcare | 3–4 weeks |
| Malls and offices | Chillers, LED lighting drivers, escalators | See commercial buildings | 2–3 weeks |
| Workshops and small plants | Compressors, machining motors | Compact fixed-plus-automatic bank | 1–3 weeks |
Panels are built to IEC 61439-1/-2 with ABB, Schneider Electric and Siemens components. See our APFC panels page for steps and controllers.
What is the difference between a capacitor bank and a harmonic filter?
A capacitor bank supplies reactive current to lift the power factor; a harmonic filter removes distortion from the supply. LED drivers, drives and UPS units create distortion, and a plain bank beside them can overload. Where a survey shows distortion, we add series reactors or a filter. Otherwise a standard automatic panel is enough.
Where in Al Khobar do we work?
Our work area runs from the Corniche and the towers along the waterfront to Thuqbah and Aziziyah, the King Fahd Causeway approach, and Dhahran Techno Valley next door. Most jobs are occupied buildings, so we plan installation and commissioning outside peak hours with the building manager.
Saudi Aramco approves Saudi Power Factor Company as a supplier, and we have worked in Saudi Arabia since 2010. We are available for projects across Saudi Arabia, including Al Khobar. Our Dammam page covers the industrial cities next door.
Our address (Dammam)
Saudi Power Factor Company King Abdulaziz Street, Dammam, Eastern Province, Saudi Arabia Email: inquiry@saudipowerfactor.com
[Map: embed the Google Map for the King Abdulaziz Street, Dammam address]
How does an Al Khobar installation run?
- You send the bill, or we take a clamp reading in your electrical room.
- We size the steps and check the panel fits the room and door.
- You approve the drawings and quotation.
- The panel is built and tested in Dammam.
- We deliver and connect it out of hours, then test each step under load.
- You keep the drawings and test record.
Al Khobar power factor questions
Who provides power factor correction in Al Khobar?
Saudi Power Factor Company provides power factor correction in Al Khobar from its Dammam office and workshops, handling sizing, panel manufacture, delivery and commissioning. We are approved by Saudi Aramco and certified to ISO 9001, ISO 14001 and ISO 45001.
What affects the cost of an Al Khobar capacitor bank?
Cost follows the kVAr, the number of steps, whether reactors are needed for harmonics, the enclosure and the room it must fit. A bill gives us the demand, and a survey is added only where distortion or fast load swings need measuring first.
How long does installation take in Al Khobar?
Lead time depends on the equipment and your drawing approval, and ours is 2–3 weeks for an APFC panel and 3–4 weeks for a detuned bank. Delivery from Dammam is a short road trip, and connection and commissioning in an occupied building is usually planned as one overnight or weekend visit.
Is there a power factor correction company near me in Al Khobar?
Yes. We are in Dammam, the next city, and our site response in the Eastern Province is within one working day. Our engineers can usually come and see the electrical room and take a clamp reading before quoting.
Can you correct power factor in a building with chillers and lifts?
Yes. We read the chiller and lift loads from your bill and logger, choose a controller that follows the swings, and add detuning where drives are present. The panel is sized to fit your electrical room and its door.