Power Factor Correction in Jubail
Saudi Power Factor Company provides power factor correction in Jubail for process, steel, utility and fabrication plants. Panels are designed and tested in our Dammam workshops, about 90 km south of Jubail, and travel north by road. You get a proposal sized from your electricity bill or load list, with a site visit about 1 hour from Dammam and a response within one working day.
What you receive: a written Jubail proposal with kVAr, equipment, standard, delivery plan and price within one working day of receiving your bill. Request a quotation

Power factor correction in Jubail: equipment by plant area
Heavy continuous loads and drives set the choice more than floor area does. The table maps typical Jubail plant areas to the equipment we propose.
| Plant area | Typical loads | Equipment we propose | Standard |
|---|---|---|---|
| Process units and pump houses | Large pump and compressor motors on drives | Detuned APFC panel or harmonic filter | IEC 61439-1/-2; IEEE 519 for harmonic limits |
| Steel and metal fabrication | Welders, cranes, induction heating | Fast-switching thyristor correction | IEC 61439-1/-2 |
| Utilities and water treatment | Pumps, blowers, chillers | Automatic panel with stepped capacitors | IEC 61921 / IEC 60831 capacitors |
| Contractor yards and workshops | Mixed small motors and lighting | Compact APFC panel | IEC 61439-1/-2 |
| Plant incomer at medium voltage | Whole-plant reactive demand | Engineer-reviewed MV bank | Project specification |
Ratings run to project specification: APFC panels run from 25 to 1,200 kVAr per panel, larger loads in parallel sections. We build with ABB, Schneider Electric and Siemens components.
How is power factor penalty calculated?
A penalty is normally built from the reactive energy your meter records against the active energy in the same billing month, so a plant with idle motors and lightly loaded drives pays more. Read the charge line on your own bill and send it to us; we convert it into the kVAr that removes it. Our power quality survey is the next step when the bill alone cannot explain the figure. Tariff rules are set by SEC. Under the Saudi Electricity Company tariff: 0.90 is the minimum above 1 MVA contract load; we design to 0.95.
How do you reduce harmonics in an electrical system?
You reduce them at the source or you stop the capacitors from amplifying them. Variable-speed drives on pumps and compressors are common in Jubail, and a plain capacitor bank beside them can resonate with the supply. We then specify reactors in series with the capacitors, or a harmonic filter panel, after a logger shows the real distortion.
Which Jubail areas do we serve?
We work in Jubail Industrial City, covering both Jubail 1 and Jubail 2, and in the commercial districts of Jubail town. Typical sites include petrochemical and fertiliser units, steel and metal works, industrial-gas and utility plants, and the contractors who support them. Our page for petrochemical and plastics plants covers the process-industry loads in more detail, and the medium-voltage compensation page covers incomer banks.
Saudi Power Factor Company is approved by Saudi Aramco, SABIC and the Royal Commission for Jubail and Yanbu, which manages Jubail Industrial City. In Jubail itself, we have worked on projects for SABIC. We are available for projects across Saudi Arabia, including Jubail.
Our address (Dammam)
Saudi Power Factor Company King Abdulaziz Street, Dammam, Eastern Province, Saudi Arabia Email: inquiry@saudipowerfactor.com
[Map: embed the Google Map for the King Abdulaziz Street, Dammam address]
How does delivery from Dammam to Jubail work?
- You send the bill, a load list or a single-line diagram.
- We size the correction and issue drawings with the quotation.
- After approval the panel is built and tested in Dammam.
- We truck it north and agree site access, permits and a shutdown slot with your team.
- Our engineers install, connect and commission, then test the steps under load.
- You receive drawings, test records and a handover note.
Jubail power factor questions
Who provides power factor correction in Jubail?
Saudi Power Factor Company provides power factor correction in Jubail from its Dammam base, covering sizing, panel manufacture, delivery and commissioning. We have operated since 2010 and hold approvals from Saudi Aramco, SABIC and the Royal Commission.
What affects the cost of a Jubail capacitor bank or APFC panel?
The kVAr required, steady or fluctuating load, harmonic content, the number of steps, enclosure and IP rating, and whether the voltage is low or medium. A survey adds cost but prevents mis-sizing. Your bill lets us price against actual demand.
How long does a Jubail installation take?
Duration depends on equipment type, drawing approval and your shutdown window. Our typical lead time is 2–3 weeks for an APFC panel and 3–4 weeks for a detuned bank. Sizing from a bill can be returned within one working day, and the on-site connection and commissioning is usually a short visit.
Can you work inside a Jubail plant's permit system?
Yes. We provide method statements, a named team and the documents your permit office asks for before the visit, and we plan the work around your shutdown or turnaround so that production loads are not interrupted.
Is there a power factor correction company near me in Jubail?
Our engineers start from Dammam, about 90 km away, and travel time to your gate is about 1 hour. We advise by email first, using your bill, so the visit is spent on measurement and installation.
Need power factor correction in Jubail? Email one month of Jubail electricity bills, or a motor list, and our quotation reaches you within one working day.
Email: inquiry@saudipowerfactor.com | Request a quotation
