City

Power Factor Correction in Yanbu

Saudi Power Factor Company provides power factor correction in Yanbu for refining, petrochemical, power and utility plants, and for contractors working inside Yanbu Industrial City. We are approved by the Royal Commission for Jubail and Yanbu, which manages the city, as well as by Saudi Aramco and SABIC. Panels come from Dammam with a full document pack (road freight takes 2–3 days).

What you receive: a written Yanbu proposal with kVAr, datasheets, test plan, freight plan and price within one working day of receiving your bill or specification. Request a quotation

Documented detuned power factor correction panel prepared in Dammam for a Yanbu plant

What causes low power factor in a Yanbu plant?

Lightly loaded induction motors, transformers running below rating, welding sets and crushers draw reactive current without doing work. In process plants the motors on pumps and compressors are the main source, and their drives add harmonics. A survey separates the two, which tells us whether to specify a plain panel, a detuned capacitor bank or a filter. In Yanbu we have worked on projects for Marafiq.

How do you avoid a power factor penalty in Yanbu?

You hold the plant at or above the tariff target all month, at every load level. A fixed bank cannot do that when load changes, so we use an automatic controller with enough steps and enough range to follow the lowest demand. SEC sets the tariff terms (Saudi Electricity Company tariff: 0.90 minimum above 1 MVA contract load), and we size to 0.95.

Power factor correction in Yanbu: documents delivered with the panel

Vendor-listed sites expect paperwork as well as hardware. The table lists what accompanies a Yanbu panel.

Document Content Standard referenced
Datasheet and general arrangement Ratings, steps, dimensions, weight Project specification
Single-line and wiring drawings Power and control wiring IEC 61439-1/-2
Capacitor and reactor data Rated kVAr, detuning, temperature class IEC 61921 / IEC 60831
Inspection and test record Routine tests, signed IEC 61439-1/-2
Inspection and test plan Hold and witness points agreed with your inspector

We build with ABB, Schneider Electric and Siemens components, and our systems are certified to ISO 9001, ISO 14001 and ISO 45001. Our approvals page explains what the vendor listings cover.

Which Yanbu areas do we serve?

We supply plants in Yanbu Industrial City, the Yanbu Commercial Port area and the contractors who support them. Typical loads are refinery and petrochemical units, power and desalination plants, pumping stations and logistics sites. See the oil and gas and petrochemical pages for the load types. Yanbu is on the Red Sea coast, a long way from our Dammam workshops, so freight and any site travel are shown on the quotation. Panels ship by road in 2–3 days, and survey teams travel by air or road.

We are available for projects across Saudi Arabia, including Yanbu. Saudi Power Factor Company has operated since 2010. Our Jubail page covers the other Royal Commission city.

Our address (Dammam)

Saudi Power Factor Company King Abdulaziz Street, Dammam, Eastern Province, Saudi Arabia Email: inquiry@saudipowerfactor.com

[Map: embed the Google Map for the King Abdulaziz Street, Dammam address]

How does a Yanbu order run?

  1. Send the bill, load list or the project specification with its data sheet.
  2. We return kVAr, step count and a document list.
  3. Drawings and the inspection and test plan are approved by your team.
  4. The panel is built, tested and recorded in Dammam.
  5. It is crated and freighted to Yanbu with its document pack.
  6. Installation and commissioning follow the schedule agreed at order.

Yanbu power factor questions

Who provides power factor correction in Yanbu?

Saudi Power Factor Company provides power factor correction in Yanbu from its Dammam base, from sizing and documentation to build, freight and commissioning. Established in 2010, we work with Saudi Aramco, SABIC and the Royal Commission.

What affects the cost of a Yanbu capacitor bank?

The kVAr, the step count, detuning or filtering for drives, the document and test scope, the enclosure and freight from Dammam. A tender specification with a long witness-test list costs more than a standard panel, and we price it as a separate line.

How long does delivery to Yanbu take?

Lead time is 2–3 weeks for an APFC panel and 3–4 weeks for a detuned bank, plus freight of 2–3 days by road. Time also depends on drawing approval and how fast your team signs off the inspection and test plan, so we put those dates in the quotation.

Can you answer a Yanbu tender specification clause by clause?

Yes. We take your specification or datasheet, answer each clause, list our deviations plainly and hold the build until the drawings and calculations are approved by your consultant or engineer.

Is there a power factor correction company near me in Yanbu?

Our office is in Dammam, across the Kingdom from Yanbu. We quote and design remotely, then arrange freight and commissioning with you at order stage, so you know who attends the site before you commit.


Need power factor correction in Yanbu? Send the bill or the specification and the quotation, with freight to Yanbu itemised, follows within one working day.

Email: inquiry@saudipowerfactor.com | Request a quotation